Construction of a new hotel institute in the Borough of Saint-Hubert
CONSTRUCTION DATE: 2017
ARCHITECT: Menkès Shooner Dagenais Letourneux architectes
CLIENT: Commission scolaire Marie-Victorin
New construction of a two-storey, 57,700 square-foot building with a concrete and steel structure. The exterior cladding is a surface of steel and aluminum panels as well as a membrane roof.