Des Marguerite elementary school

Notre-Dame-de-Grâce Cultural Centre
1 December 2015
MAJ (art museum)
MAJ (art museum)
1 January 2015
 

Construction of the Des Marguerites elementary school

CONSTRUCTION DATE: 2015

ARCHITECTS: Réalisation conjointe de HELOÏSE THIBODEAU Architecte et BIRTZ BASTIEN BEAUDOIN LAFOREST Architectes

CLIENT: Commission scolaire Marguerite-Bourgeoys


This structure stands out architecturally for its 3 blocks composed of a 3-storey academic block, including 20 classrooms, 3 kindergartens and 2 daycare rooms, a sports block as well as an administrative block housing the administrative staff's offices and a multi-purpose room. This school is heated by a geothermal system that required the drilling of 26 wells. This steel structure building is constructed on conventional concrete foundations.

 
 

Construction of the Des Marguerites elementary school

CONSTRUCTION DATE: 2015

ARCHITECTS: Réalisation conjointe de HELOÏSE THIBODEAU Architecte et BIRTZ BASTIEN BEAUDOIN LAFOREST Architectes

CLIENT: Commission scolaire Marguerite-Bourgeoys


This structure stands out architecturally for its 3 blocks composed of a 3-storey academic block, including 20 classrooms, 3 kindergartens and 2 daycare rooms, a sports block as well as an administrative block housing the administrative staff's offices and a multi-purpose room. This school is heated by a geothermal system that required the drilling of 26 wells. This steel structure building is constructed on conventional concrete foundations.